57 lines
2.8 KiB
Markdown
57 lines
2.8 KiB
Markdown
|
||
# Changelog
|
||
|
||
## [2.1.1] - 2026-08-11
|
||
### Added
|
||
- Stable setup/uninstall phase codes, environment and file metadata, complete self-test output, exception chains with HRESULT/stacktrace, and per-step rollback diagnostics.
|
||
- Installer-log fallback from ProgramData to Temp plus a setup button for opening diagnostic logs.
|
||
- Post-write verification of shortcuts, uninstall executable and essential uninstall-registry values.
|
||
- Regression coverage for pre-mutation rollback wording, diagnostic context, log fallback and UI-report isolation.
|
||
|
||
### Changed
|
||
- Pre-mutation failures now explicitly report that no rollback was required; completed rollbacks are only reported as successful when every restoration step succeeded.
|
||
- Self-test timeout handling is bounded after termination is requested and records kill/capture status.
|
||
- Technical installer acceptance is explicitly separated from BizTalk WMI/environment validation.
|
||
- Setup and uninstall preserve undeletable backup/quarantine data and record a successful completion with a cleanup warning.
|
||
|
||
## [2.1.0] - 2026-08-11
|
||
### Added
|
||
- Transactional Windows setup/updater with SHA-256 payload manifest, isolated staging, pre/post activation self-tests, rollback, shortcuts and uninstall registration.
|
||
- Certutil-compatible installer ZIP as Base64 TXT plus separate ZIP SHA-256 file.
|
||
- WMI-free application self-test and regression test project covering persistence, diffs, restore safety, CSV hardening and installer rollback.
|
||
- UAC manifest and single-instance protection for the management application.
|
||
|
||
### Changed
|
||
- Snapshot and plan JSON writes now replace files atomically and keep BOM-tolerant reads.
|
||
- Snapshot diffs identify artifacts by application and name.
|
||
- Restore planning rejects snapshots from a different target server.
|
||
- Real shutdown/restore requires confirmation of the fully prepared and saved plan.
|
||
- Runtime logs are written to `%ProgramData%\BizTalkPlatformManagementTool\Logs` with executable-directory fallback.
|
||
- WMI query objects and WMI method output objects are disposed deterministically.
|
||
- CSV exports neutralize formula-like cell prefixes.
|
||
|
||
## [Unreleased] - 2026-04-27
|
||
### Changed
|
||
- Projekt auf `BizTalkPlatformManagementTool` umbenannt.
|
||
- Solution, Projektdatei, Namespace, Assemblyname und Standard-Ausgabepfad angepasst.
|
||
- Dokumentation aktualisiert und `Installation.md` ergänzt.
|
||
|
||
## [1.3.0] - 2026-02-02
|
||
### Added
|
||
- HTML Report mit farblicher Kennzeichnung (grün/rot)
|
||
- Farbige Statusausgabe auf STDOUT
|
||
- Remote‑Server Parameter (-Server) und Ausgabeverzeichnis (-OutDir)
|
||
- Verbesserte Diff‑Erkennung (neu/entfernt)
|
||
|
||
## [1.2.0] - 2026-02-02
|
||
### Added
|
||
- Remote‑fähige Snapshot‑Funktion, Logging (Konsole + Datei)
|
||
|
||
## [1.1.0] - 2026-02-02
|
||
### Added
|
||
- Textuelle Diff‑Ausgabe auf STDOUT + HTML Report
|
||
|
||
## [1.0.0] - 2026-02-02
|
||
### Added
|
||
- Grundfunktion: Snapshot & Diff (Receive Locations, Send Ports, Orchestrations)
|